Adopting the mode of ‘front-end process package + digital delivery’, we achieve full-process control from process design, equipment selection to engineering implementation, and our unique 3D collaborative design platform shortens the construction cycle by 30%, with a 98% project acceptance rate, creating a complete industry chain of turnkey projects from gas source treatment to LNG storage and transportation.
Self-developed core process packages such as MRC hybrid refrigeration and BOG re-condensation, providing a full range of liquefaction equipment for daily processing of 1-500,000 m³ per day. Innovatively adopting factory prefabricated skid-mounted modules, the pre-installation rate of key equipment reaches 85%, the on-site construction cycle is shortened by 60% compared with the traditional mode, and the energy efficiency index of the equipment exceeds the GB/T22724 standard by 15%.
The company has built a ‘5G+AI’ intelligent construction site system, which realises the traceability management of the whole construction process through the triple protection system of personnel positioning, equipment status monitoring and risk early warning, and the cumulative safe working hours have exceeded 2 million hours. We provide 18 standardised services such as driving and commissioning, operation training, and emergency plan preparation, and establish an ISO18436 certified engineer training system.
Deploying intelligent IOT operation and maintenance platform, real-time monitoring of 200+ equipment operation parameters, fault warning accuracy rate of 92%. Equipped with 20 professional on-site teams, we commit to a 2-hour emergency response mechanism, provide value-added services such as spare parts supply, process optimisation, energy efficiency improvement, etc., to guarantee the annual running time of the plant ≥ 8,000 hours.
We have successfully delivered 30+ liquefaction plant projects, with a cumulative liquefaction capacity of more than 5 million m³/d. We have helped our customers to reduce their operating costs by 15% through our full value chain services, and built the core competitiveness of the clean energy industry.
By utilizing a unique 3D collaborative design platform and the "front-end process package + digital delivery" mode, we achieve full-process control and shorten the overall construction cycle by 30% with a 98% project acceptance rate.
We self-develop core process packages like MRC hybrid refrigeration and BOG re-condensation, supporting daily processing capacities ranging from 1 to 500,000 m³ per day.
Our factory prefabricated skid-mounted modules reach a pre-installation rate of 85% for key equipment. This shortens the on-site construction cycle by 60% compared to traditional construction methods.
We implement a "5G+AI" intelligent construction site system featuring personnel positioning, equipment status monitoring, and risk early warning. This has helped us achieve over 2 million safe working hours.
We offer a 2-hour emergency response through 20 professional on-site teams and monitor 200+ parameters via an IoT platform. This guarantees an annual plant running time of ≥ 8,000 hours.
We have successfully delivered over 30 liquefaction plant projects, accumulating a total liquefaction capacity of more than 5 million m³/d while reducing customer operating costs by 15%.