Home >
Hot Products >
China Suppliers and Factory for Skid-Mounted LNG Liquefaction Equipment for Natural Gas and Shale Gas
1 / 1
China Suppliers and Factory for Skid-Mounted LNG Liquefaction Equipment for Natural Gas and Shale Gas
Discover advanced skid-mounted liquefaction equipment designed for natural gas, shale gas, coal bed methane, and associated gas applications. Our cutting-edge skid-mounted LNG liquefaction system showcases innovative technology and is perfect for various industrial uses. As a leading supplier in China, we ensure high-quality manufacturing standards at our factory, delivering reliable solutions for your liquefaction needs. Explore how our products can enhance your operations and meet the growing demand for efficient gas processing.
Skid-mounted natural gas liquefaction system adopts modular integration technology, integrating pre-treatment and pressure regulation, deep purification, hybrid refrigeration and liquefaction as well as intelligent storage and transportation, and the core unit is highly integrated through standardised skid blocks (12m×3m×3.5m). For the scenario of daily processing capacity of less than 30,000 cubic metres, the first compressor and cold box integrated design eliminates the on-site refrigerant pipeline connection, reducing the risk of leakage by 90%, and the overall system occupies 40% less space than traditional equipment. Through the flexible combination of 3-6 standard skids, the system can be expanded to 300,000 m3/day processing capacity, which is suitable for the development of marginal gas fields, shale gas wells and other decentralised gas sources.
The system covers five major application dimensions:
1dynamic peaking of urban gas pipeline network;
2resource utilisation of associated gas from oil fields;
3recovery of scattered gas from remote gas wells;
4efficiency improvement of unconventional gas such as coal bed methane/biogas;
5low-carbon conversion of industrial tail gas.
The core technology adopts a three-stage process chain: molecular sieve double-tower dehydration to make the gas dew point ≤ -70℃, nitrogen-methane cascade refrigeration to optimise the energy consumption by 18%, and BOG recondensation technology to ensure the liquefaction rate of more than 98%.
Core Advantages
The core advantages are embodied in the ‘four poles’ characteristics:
Extremely simple deployment
factory pre-installation rate of 95%, on-site within 7 days to complete the group skid;
Extremely Intelligent O&M
5G Internet of Things (IoT) platform for remote control and energy efficiency monitoring;
Extremely fast response
2-4 months delivery cycle, 60% shorter than traditional model;
Extreme Return
modular expansion reduces marginal cost, payback period <24 months.
Applicable to projects processing 1-100,000 tonnes of LNG per year, it has become an efficient mobile solution in the field of distributed gas source development.
Frequently Asked Questions (FAQ)
QWhat is the space-saving advantage of the skid-mounted natural gas liquefaction system?
For scenarios with a daily processing capacity of under 30,000 cubic meters, the integrated design of the compressor and cold box eliminates on-site refrigerant pipeline connections, reducing the overall footprint by 40% compared to traditional equipment.
QHow fast can the system be deployed on-site?
The system features a factory pre-installation rate of 95%, allowing complete group skid deployment on-site within just 7 days.
QWhat are the key application dimensions for this system?
It covers five major applications: urban gas pipeline network dynamic peaking, resource utilization of oil field associated gas, recovery of scattered gas from remote wells, efficiency improvement of unconventional gas (coal bed methane/biogas), and low-carbon conversion of industrial tail gas.
QWhat core technologies are used to optimize energy and liquefaction rates?
The system employs molecular sieve double-tower dehydration (dew point ≤ -70℃), nitrogen-methane cascade refrigeration (optimizing energy consumption by 18%), and BOG recondensation technology to guarantee a liquefaction rate exceeding 98%.
QWhat is the typical delivery cycle and payback period?
The delivery cycle is 2-4 months, which is 60% shorter than traditional models, and the modular design ensures a payback period of less than 24 months.
QWhat capacity ranges can this skid-mounted system handle?
It is designed to handle daily processing capacities starting from under 30,000 cubic meters using standard blocks, and can be flexibly expanded up to 300,000 cubic meters per day by combining 3-6 standard skids. It is suitable for projects processing 1 to 100,000 tonnes of LNG annually.