Skid-mounted natural gas liquefaction system adopts modular integration technology, integrating pre-treatment and pressure regulation, deep purification, hybrid refrigeration and liquefaction as well as intelligent storage and transportation, and the core unit is highly integrated through standardised skid blocks (12m×3m×3.5m). For the scenario of daily processing capacity of less than 30,000 cubic metres, the first compressor and cold box integrated design eliminates the on-site refrigerant pipeline connection, reducing the risk of leakage by 90%, and the overall system occupies 40% less space than traditional equipment. Through the flexible combination of 3-6 standard skids, the system can be expanded to 300,000 m3/day processing capacity, which is suitable for the development of marginal gas fields, shale gas wells and other decentralised gas sources.
Five Application Dimensions
Dynamic peaking of urban gas pipeline network
Resource utilisation of associated gas from oil fields
Recovery of scattered gas from remote gas wells
Efficiency improvement of unconventional gas such as coal bed methane/biogas
Low-carbon conversion of industrial tail gas
Three-Stage Process Chain
01
Dehydration
Double-tower molecular sieve, dew point ≤ -70℃
02
Refrigeration
Nitrogen-methane cascade, +18% energy optimized
03
Condensation
BOG recondensation, >98% liquefaction rate
Core Advantages
The core advantages of the skid-mounted natural gas liquefaction system are represented by its specialized "four poles" characteristics, making it an exceptionally efficient mobile solution suitable for projects processing 1-100,000 tonnes of LNG annually in the field of distributed gas source development.
Deploy
Extremely Simple
Factory pre-installation rate of 95%, with complete on-site group skid setup achieved within 7 days.
O & M
Extremely Intelligent
5G Internet of Things (IoT) platform for seamless remote control and energy efficiency monitoring.
Response
Extremely Fast
2-4 months delivery cycle, which is 60% shorter than the traditional construction model.
Return
Extreme Return
Modular expansion minimizes marginal cost, securing a payback period of less than 24 months.
Frequently Asked Questions
Q:
What is the typical processing capacity of this skid-mounted liquefaction system?
A: For scenarios with a daily processing capacity of less than 30,000 cubic metres, we utilize an integrated compressor and cold box design. Through a flexible combination of 3-6 standard skids, the system's capacity can be expanded up to 300,000 cubic metres per day.
Q:
How does the modular design prevent refrigerant leakage risks?
A: The system features an integrated design of the compressor and cold box, which eliminates the need for on-site refrigerant pipeline connections. This innovative integration reduces the risk of leakage by 90% and decreases the physical footprint by 40% compared to traditional set-ups.
Q:
What technologies are utilized to optimize energy efficiency during liquefaction?
A: The system implements a three-stage process chain: molecular sieve double-tower dehydration (dew point ≤ -70℃), nitrogen-methane cascade refrigeration which optimizes overall energy consumption by 18%, and BOG recondensation technology to ensure a liquefaction rate exceeding 98%.
Q:
How long does the deployment and installation process take on-site?
A: Due to a high factory pre-installation rate of 95%, the system can complete group skid assembly and configuration on-site within just 7 days. The complete delivery cycle ranges from 2 to 4 months, which is 60% faster than traditional models.
Q:
Is this system suitable for remote or unconventional gas sources?
A: Yes, it is highly suitable for decentralized gas sources, including the development of marginal gas fields, shale gas wells, oil field associated gas, scattered gas from remote wells, and unconventional gas sources like coal bed methane or biogas.