In the face of complex gas source conditions, the equipment can be flexibly equipped with pressure boosting, hydrocarbon removal, desulphurisation and other functional units to ensure that the quality of the gas source meets the standards.
It is especially suitable for projects that are difficult to be covered by traditional facilities, such as scattered gas fields, remote oil and gas wells, and evaluation wells, etc., which can help energy companies to solve the resource development problems and create higher economic benefits and environmental values.
The station requires a total floor space of approximately 30 by 45 meters and is capable of producing a stable daily capacity of 3 to 10 m³ of liquefied natural gas.
By utilizing advanced prefabricated pipeline technology, it takes only 15 days for the site reassembly, followed by 5 days for commissioning, bringing the total time to operation to just 20 days.
Yes, the station is highly flexible. It can be integrated with optional units for pressure boosting, hydrocarbon removal, and desulphurisation to handle complex gas sources and meet specific output standards.
The system consists of modular skid components including the dehydration pry block, processing skid unit, pre-cooling unit pry, main cooling unit pry, and the cold box pry.
It is ideal for remote or scattered gas fields, trial mining operations, evaluation wells, temporary gas testing, and emergency gas recovery where permanent pipelines or facilities are not feasible.